Detailed Engineering Kiln Ducts Pipe K11.04
CIMAT, Beni Mellal - Morocco, 04/2017

The CIMAT cement plant detected anomalies in the tertiary air pipe following the expansion phenomenon and its filling with dust, which are:
- Opening of the joint system after bending,
- shear phenomenon of connection flanges.
In order to overcome the various anomalies therein, IAPS is ordered by DGM ( part of DLM) to provide a solution consisting of :
- designing a permanent support (which replaces the temporary support installed by CIMAT) allowing the free movement of the sheath due to the phenomenon of expansion and minimize bending of the pipe,
- reinforcing the existing connection flanges…
Principal project data
Supporting of the tertiary pipe K11.04
Scope IPS
- Mechanical Detailed design
IPS operational unit(s)
- IAPS SARL